Skip to main content

ESDIS Weekly Metrics: February 23, 2026

Image

Note:

  1. The volume distributed to end users per day, as a running average over the last 4 weeks, is 8.649 times the volume added to the archive per day.

LANCE Data Latency

Image

Note:

Higher product latencies for:

  • OMPS-SNPP, on 6 February 2026, due to receiving the L0 data from EDOS, late.
  • OMPS-SNPP, on 18 February 2026, is under investigation.
Image
Image

Note:

  1. Latency for a data granule is defined as the time taken from the midpoint between the start and end of acquisition of the data for that granule to the granule’s being ready on-line for users to download.  
  2. Duration covered by the data for a granule is defined differently for six different instruments (e.g., MODIS granules are 5 minutes long while OMI NRT granules are 13 to 136 minutes long).
  3. Over the last four weeks, over 95% of NRT data requests for all instruments except for six instruments (SMAP L-BAND RADIOMETER-SMAP, TROPOMI-SENTINEL-5P, VIIRS-NOAA-20-Land, VIIRS-SNPP-Land, VIIRS-NOAA-20-Atmosphere, and VIIRS-NOAA-21-Land) were satisfied within 3 hours. SMAP L-BAND RADIOMETER-SMAP, TROPOMI-SENTINEL-5P, VIIRS-NOAA-20-Land, VIIRS-SNPP-Land, VIIRS-NOAA-20-Atmosphere, and VIIRS-NOAA-21-Land over 86%, 91%, 93%, 79%, 84%, and 85% of the NRT data requests were satisfied within 3 hours, respectively.

Global Imagery Browse Services (GIBS)

Image

Worldview

Image