Delivery of new Suomi NPP data ceases on Nov. 2, 2026. Users should transition to alternative products.Suomi NPP data announcement
Migration to Consolidated Ingest and Archive will interrupt data ingestion at PO.DAAC, ASF DAAC, and GES DISC on Oct. 28-30, 2026.Read more
ESDIS Weekly Metrics: March 31, 2025
Image
Note:
The volume distributed to end users per day, as a running average over the last 4 weeks, is 2.2.64 times the volume added to the archive per day.
LANCE Data Latency
Image
Note:
Higher product latencies for:
SMAP L-BAND RADIOMETER-SMAP, March 25 and 27, 2025
OMPS-SNPP, March 26 and 28, 2025
VIIRS-SNPP-Atmosphere and VIIRS-NOAA-20-Atmosphere, March 25 and 28, 2025, are currently under investigation. Updates will be provided in next week’s report.
VIIRS-NOAA-20-Land, March 27, 2025, due to an issue with L0 data
VIIRS-SNPP-Land, March 28, 2025, due to a gap in L0 data
Image
Image
Note:
Latency for a data granule is defined as the time taken from the midpoint between the start and end of acquisition of the data for that granule to the granule’s being ready online for users to download.
Duration covered by the data for a granule is defined differently for different instruments (e.g., MODIS granules are 5 minutes long while OMI NRT granules are 13 to 136 minutes long).
Over the last 4 weeks, over 95% of NRT data requests for all instruments except for 5 instruments (OMPS-SNPP, SMAP L-BAND RADIOMETER-SMAP, VIIRS-SNPP-Land, VIIRS-SNPP-Atmosphere, and VIIRS-NOAA20-Atmosphere) were satisfied within 3 hours. OMPS-SNPP, SMAP L-BAND RADIOMETER-SMAP, VIIRS-SNPP-Land, VIIRS-SNPP-Atmosphere, and VIIRS-NOAA20-Atmosphere over 93%, 76%, 79%, 90%, and 94% of the NRT data requests were satisfied within 3 hours, respectively.
MOPITT in Safe Mode: On February 1, 2025, the Terra Measurement of Pollution in The Troposphere (MOPITT) instrument went into safe mode. While in safe mode, there will be no MOPITT science data collected. As of March 31, 2025, the MOPITT Subsetter will be decommissioned.